Product Detail
Product Tags
Related Video
Feedback (2)
The customer satisfaction is our primary goal. We uphold a consistent level of professionalism, quality, credibility and service for Non Woven Polyester Fabric , Biaxial Fabric Cloth , Mesh Machine , Good quality and competitive prices make our products enjoy a high reputation all over the word.
OEM/ODM China Technical Warp Knitting Machine - YRS3-N-F-I Type Chopped Biaxial Warp Knitting Mahcine – Yixun Detail:
*Mainly applied for wind power generation,cabin cover,aerospace and composite fabric
Application Case
General assembly drawing
Specifications
Width |
101 inch |
Gauge |
E7 |
Speed |
50-1200r/min(The specific speed depend the products.) |
Bar Number |
2 Bars |
Pattern Drive |
Split Pattern Disc |
Warp Beam Support |
30 inches beam,EBC |
Take-up Device |
Electronic Take-up |
Batching Device |
Electronic Batching |
Chopped Device |
1 Chopped Device,Servo System Controlling. |
Weft-insertion System |
Weft Insertion,Servo System Controlling. |
Power |
31 kW |
|
This type’ s machine could be personal designed |
Product detail pictures:
Related Product Guide:
Usually customer-oriented, and it's our ultimate focus on to be not only by far the most reliable, trustable and honest provider, but also the partner for our customers for OEM/ODM China Technical Warp Knitting Machine - YRS3-N-F-I Type Chopped Biaxial Warp Knitting Mahcine – Yixun , The product will supply to all over the world, such as: Georgia, Denmark, Cancun, Relying on superior quality and excellent post-sales, our products sell well in America, Europe, the Middle East and South Africa. We are also the appointed OEM factory for several worlds' famous products brands. Welcome to contact us for further negotiation and cooperation.
This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
By Josephine from Guinea - 2017.04.08 14:55
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Fernando from US - 2017.06.19 13:51